Data centres risk a land crisis like never before. Help us sound the alarm before it’s too late.

In the race to build capacity for AI, England is seeing a huge increase in applications for large-scale data centres. But there’s no plan to guide where they go, or how they’re built and run, meaning the countryside could become a dumping ground for these massive, water- and energy- intensive developments. The risk is a land crisis like never before, with huge impacts on landscapes, tranquility, nature and health. That’s why we’re calling for a pause to unchecked data centre development.

We’ve had data centres for as long as we’ve had information technology (IT). Their numbers (and efficiency) have grown as our use of the internet has grown. But the current boom in data centres isn’t just down to ordinary demand. It’s also being driven by the race to build AI capacity, which could account for around 70% of all UK data centre capacity by 2035.

AI could help address some of our biggest challenges. But data centres, along with homes, energy, transport, food and nature, are all competing for the same finite supply of land. With no plan to guide their development, we could be walking into a land crisis.

Data centres consume huge amounts of power. London’s data centres alone use as much power as 750,000 homes. Some are even seeking their own on-site gas power generation rather than waiting for an already overstretched grid — meaning more carbon emissions locked in for decades.

But it’s not just energy. Even medium-sized data centres can use up hundreds of millions of litres of water a year — and some systems even use drinking water. Worse still, Global Action Plan’s 2026 report suggests that most data centres planned in the UK are in water-stressed areas. This just doesn’t make sense.

Where data centres go matters too, and so do the communities who will be most affected by their development and operation. And yet, the rules are being rewritten to push them through even faster. Some schemes can opt into the Nationally Significant Infrastructure Project (NSIP) scheme designed to fast-track these kinds of projects. That means some data centre developments could bypass local councils and local people before the government has even published the policy designed to govern them. Community voices are being swept aside in the gold rush and — once again — the countryside is treated as expendable.

There are at least 100 data centres in the pipeline, but no government body tracks them, and information about their resource consumption is scarce. We need to press pause on unchecked data centres before we sleepwalk into a land crisis like never before.

Take action on data centres

Closeup server room data center for cloud computing

What we want to see

Data centres are important infrastructure and support many aspects of our day-to-day lives. But the frantic race to build new, hyperscale data centres does not mean they should be free from rules and regulations. And there needs to be a proper plan and proper policies to guide their development. Without these, we’re risking a barrage of unchecked data centre development, without scrutiny or community involvement, with potentially devastating impacts for nature, landscapes and farmland. We’ve set out five things we want to see happen before data centres get out of hand.

1. A brownfield first policy

Building on previously-developed (brownfield) makes the best use of our finite land. A robust and strongly enforced brownfield-first policy for data centres would help protect valuable landscapes and productive farmland in the countryside.

 

 

2. Dedicated planning rules

Development needs rules, and massive, resource-hungry infrastructure like data centres are no exception. And right now, we simply know too little about the true impact and resource use of data centres.

We want to see dedicated planning rules for data centres so that the environmental and landscape impacts of data centres are properly assessed. That means making sure that there is transparency on the water and energy they use, and that the impact of noise, heat, light and air pollution on people is fully considered.

These rules should also ensure local communities have a genuine voice in shaping data centre development. Earlier this year, the rules were changes so that some developments could opt in to the NSIP scheme, bypassing local voices entirely.

3. Innovative data centre design

We know data centres can use a lot of energy and water — and land. We want to see ambition and innovation in data centre design which minimises the scale of development and its impacts on landscapes and resource use. Data centres also should connect to wider energy system planning, including re-using waste heat locally.

 

4. Climate targets protected

Climate change is here, and threatens landscapes, farmland, nature and communities.

We want to make sure that climate targets are protected, so that this flurry of data centre development doesn’t push them out of reach and cause emissions to spiral.

 

 

5. A public conversation about AI and data centres

The potential is there for AI to help tackle some of our biggest challenges. But AI development, and the data centres and infrastructure needed to power it, has enormous implications, not just for land, resources and nature — but for people, too. The scale and pace at which these technologies are being developed is staggering.

That’s why we need a public conversation on AI and data centres, so that there is clearer public consensus on demand and need for the scale of this technology, balancing the benefits and risks.

Data centres need to be in the right place, with proper rules and high environmental standards. No ifs, not buts.

If you agree with us, add your name and let’s sound the alarm, before it’s too late.